Baker is a 1 MW Batteries asset in CAISO (California), currently Operating.
Baker is reported in California since 2019 under Hybrid-Electric Building Technologies West Los Angeles 1, LLC. Available operating and financial measures include -0.8% capacity factor and -0 GWh annual generation; $2973/kW reported CapEx.
- Location
- Orange, California
- Technology
- Batteries
- Owner / parent
- Hybrid-Electric Building Technologies West Los Angeles 1, LLC
- Operator
- Hybrid-Electric Building Technologies West Los Angeles 1, LLC
- Grid
- CAISO (California)
- Plant ID
- 63610
What stands out
Baker is a 1 MW Batteries asset in California with status Operating.
Latest annual operating measures report -0.8% capacity factor and -0 GWh annual generation.
Available financial measures include $2973/kW CapEx.
Latest linked story: “Ørsted's solar, battery portfolio sale indicates growing generating asset values” (S&P Global, 2025-02-05).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #195 of 202
- National rank
- #974 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.