Query
Babcock Solar Energy Center Hybrid
Type
Entity Briefing
Entity
Babcock Solar Energy Center Hybrid
Generated
2026-10-17T08:39:42.030Z

Briefing on Babcock Solar Energy Center Hybrid

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
85 MW
Capacity
Operating
Current status
2016
Operating since
2
Generators
18.1%
Capacity factor
134 GWh
Annual generation
Briefing/plantOperating

Babcock Solar Energy Center Hybrid is a 85 MW Batteries asset in Florida, currently Operating.

Babcock Solar Energy Center Hybrid is reported in Florida since 2016 under NextEra Energy. Available operating and financial measures include 18.1% capacity factor and 134 GWh annual generation; $26.7/MWh reported energy value.

Location
Charlotte, Florida
Technology
Batteries, Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
59993

What stands out

1

Babcock Solar Energy Center Hybrid is a 85 MW Batteries asset in Florida with status Operating.

2

Latest annual operating measures report 18.1% capacity factor and 134 GWh annual generation.

3

Available financial measures include $26.7/MWh energy value.

4

Latest linked story: “Why I Can’t Stop Buying This Dividend Stock” (24/7 Wall St., 2026-05-25).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#6 of 237
National rank
#944 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.