Briefing/projectactive
AZALEA is a 99 MW Solar+Battery project in California, currently active.
The reported queue phase is C11. Proposed COD is 2025-09-12.
- Queue ID
- CAISO-1493
- Location
- Kern, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Arco 70 kV
What stands out
1
AZALEA is a 99 MW Solar+Battery project in California with status active.
2
The reported queue phase is C11; proposed COD is 2025-09-12.
3
Latest linked story: “Major US Solar and Storage Projects Advance in 2026: Google, Sunraycer, Invenergy Lead Development” (IndexBox, 2026-03-24).
Market and operating context
- Queue date
- 2018-04-16
- Proposed COD
- 2025-09-12
- IA status
- IA Executed
- Study phase
- C11
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.