Query
Auriga Community Solar
Type
Entity Briefing
Entity
Auriga Community Solar
Generated
2026-10-19T21:09:32.711Z

Briefing on Auriga Community Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
19.1%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Auriga Community Solar is a 1 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Auriga Community Solar is reported in Minnesota since 2018 under Geronimo Power. Available operating and financial measures include 19.1% capacity factor and 2 GWh annual generation; $18.9/MWh reported energy value.

Location
Murray, Minnesota
Technology
Solar Photovoltaic
Owner / parent
Geronimo Power
Operator
Geronimo Power
Grid
MISO (Midcontinent)
Plant ID
61706

What stands out

1

Auriga Community Solar is a 1 MW Solar Photovoltaic asset in Minnesota with status Operating.

2

Latest annual operating measures report 19.1% capacity factor and 2 GWh annual generation.

3

Available financial measures include $18.9/MWh energy value.

4

Latest linked story: “Geronimo Power's Farmer-Friendly and Community First Approach Receives Warm Welcome from Minnesota's Nobles County Community” (PR Newswire, 2026-01-28).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#400 of 549
National rank
#7444 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.