Query
Augie BESS
Type
Entity Briefing
Entity
Augie BESS
State
TN
Technology
battery
Generated
2026-10-06T20:01:15.376Z

Briefing on Augie BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Augie BESS is a 201 MW Battery project in Texas, currently active.

BRP Blue Topaz 5, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-17.

Queue ID
ERCOT-24INR0461
Location
Waller, Texas
Technology
Battery
Developer
BRP Blue Topaz 5, LLC
Market / region
ERCOT
Point of interconnection
46560 Waller 138kV

What stands out

1

Augie BESS is a 201 MW Battery project in Texas with status active.

2

BRP Blue Topaz 5, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-17.

Market and operating context

Queue date
2023-01-23
Proposed COD
2027-12-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Augie BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0461
LocationWaller, Texas
TechnologyBattery
DeveloperBRP Blue Topaz 5, LLC
Market / regionERCOT
Point of interconnection46560 Waller 138kV
Queue date2023-01-23
Proposed COD2027-12-17