Atlas BESS IV LLC is a 150 MW Batteries asset in CAISO (California), currently Under construction.
Atlas BESS IV LLC is reported in Arizona under ATLAS BESS IV, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- La Paz, Arizona
- Technology
- Batteries
- Owner / parent
- ATLAS BESS IV, LLC
- Operator
- ATLAS BESS IV, LLC
- Grid
- CAISO (California)
- Plant ID
- 68321
What stands out
Atlas BESS IV LLC is a 150 MW Batteries asset in Arizona with status Under construction.
Available financial measures include $1361/kW CapEx.
Latest linked story: “TransGrid Energy secures US$1.4 billion for two Arizona BESS totalling 450MW/1,800MWh” (Energy-Storage.News, 2025-02-25).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #39 of 61
- National rank
- #284 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.