Briefing on Atlanta TxHSR TPSS DS-1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Other
Technology
ERCOT
Market / region
2028-07-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Atlanta TxHSR TPSS DS-1 is a 50 MW Other project in Texas, currently active.

Texas Central Rail Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-15.

Queue ID
ERCOT-25INR0006
Location
Dallas, Texas
Technology
Other
Developer
Texas Central Rail Holdings, LLC
Market / region
ERCOT
Point of interconnection
tap 138kV 2429 Watermill E - 3083 Wilmer

What stands out

1

Atlanta TxHSR TPSS DS-1 is a 50 MW Other project in Texas with status active.

2

Texas Central Rail Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-15.

Market and operating context

Queue date
2019-01-30
Proposed COD
2028-07-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Atlanta TxHSR TPSS DS-1 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0006
LocationDallas, Texas
TechnologyOther
DeveloperTexas Central Rail Holdings, LLC
Market / regionERCOT
Point of interconnectiontap 138kV 2429 Watermill E - 3083 Wilmer
Queue date2019-01-30
Proposed COD2028-07-15