Briefing/projectactive
Astoria Energy Storage is a 100 MW Battery project in New York, currently active.
East River ESS, LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2026-10-01.
- Queue ID
- NYISO-931
- Location
- Queens, New York
- Technology
- Battery
- Developer
- East River ESS, LLC
- Market / region
- NYISO
- Point of interconnection
- Astoria West 138kV
What stands out
1
Astoria Energy Storage is a 100 MW Battery project in New York with status active.
2
East River ESS, LLC is the reported developer.
3
The reported queue phase is System Impact Study; proposed COD is 2026-10-01.
Market and operating context
- Queue date
- 2019-10-28
- Proposed COD
- 2026-10-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.