Briefing/projectactive
Arnold Hills Storage is a 123 MW Battery project in Texas, currently active.
Arnold Hills Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-09.
- Queue ID
- ERCOT-29INR0089
- Location
- Henderson, Texas
- Technology
- Battery
- Developer
- Arnold Hills Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- #6926 Seven Points 138kV
What stands out
1
Arnold Hills Storage is a 123 MW Battery project in Texas with status active.
2
Arnold Hills Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-02-09.
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2029-02-09
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.