Query
Armadillo Solar Center
Type
Entity Briefing
Entity
Armadillo Solar Center
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Armadillo Solar Center

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

175 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Armadillo Solar Center is a 175 MW Solar Photovoltaic asset in ERCOT (Texas), currently Under construction.

Armadillo Solar Center is reported in Texas under Ørsted. Available operating and financial measures include $1543/kW reported CapEx.

Location
Navarro, Texas
Technology
Solar Photovoltaic
Owner / parent
Ørsted
Operator
AES Clean Energy
Grid
ERCOT (Texas)
Plant ID
64349

What stands out

1

Armadillo Solar Center is a 175 MW Solar Photovoltaic asset in Texas with status Under construction.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 200 MW of proposed capacity.

4

Latest linked story: “Ørsted signs power purchase agreement with MSD” (Orsted, 2021-04-26).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#186 of 378
National rank
#476 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Armadillo Solar Center — verified asset snapshot

FieldValue
LocationNavarro, Texas
TechnologySolar Photovoltaic
Owner / parentØrsted
OperatorAES Clean Energy
GridERCOT (Texas)
Plant ID64349
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.