Arlington Battery Energy Storage System is a 25 MW Batteries asset in Washington, currently Under construction.
Arlington Battery Energy Storage System is reported in Washington under PUD No 1 of Snohomish County - (WA). Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Snohomish, Washington
- Technology
- Batteries
- Owner / parent
- PUD No 1 of Snohomish County - (WA)
- Operator
- PUD No 1 of Snohomish County - (WA)
- Grid
- Bonneville Power Administration
- Plant ID
- 67669
What stands out
Arlington Battery Energy Storage System is a 25 MW Batteries asset in Washington with status Under construction.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Battery farms, the energy industry’s new darling, line up to enter Pacific NW” (Washington State Standard, 2024-09-05).
Market and operating context
- Balancing authority
- Bonneville Power Administration
- NERC region
- WECC
- State rank
- #6 of 8
- National rank
- #508 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.