Query
Arlington Battery Energy Storage System
Type
Entity Briefing
Entity
Arlington Battery Energy Storage System
State
WA
Technology
battery
Generated
2026-10-10T17:03:08.462Z

Briefing on Arlington Battery Energy Storage System

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
25 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Arlington Battery Energy Storage System is a 25 MW Batteries asset in Washington, currently Under construction.

Arlington Battery Energy Storage System is reported in Washington under PUD No 1 of Snohomish County - (WA). Available operating and financial measures include $1361/kW reported CapEx.

Location
Snohomish, Washington
Technology
Batteries
Owner / parent
PUD No 1 of Snohomish County - (WA)
Operator
PUD No 1 of Snohomish County - (WA)
Grid
Bonneville Power Administration
Plant ID
67669

What stands out

1

Arlington Battery Energy Storage System is a 25 MW Batteries asset in Washington with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Battery farms, the energy industry’s new darling, line up to enter Pacific NW” (Washington State Standard, 2024-09-05).

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#6 of 8
National rank
#508 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Arlington Battery Energy Storage System — verified asset snapshot

FieldValue
LocationSnohomish, Washington
TechnologyBatteries
Owner / parentPUD No 1 of Snohomish County - (WA)
OperatorPUD No 1 of Snohomish County - (WA)
GridBonneville Power Administration
Plant ID67669
Balancing authorityBonneville Power Administration
NERC regionWECC