Query
ARIDA 3 SOLAR FARM
Type
Entity Briefing
Entity
ARIDA 3 SOLAR FARM
State
FL
Technology
solar
Generated
2026-10-11T06:37:44.246Z

Briefing on ARIDA 3 SOLAR FARM

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
900 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2030-07-01
Proposed COD
C13
Queue phase
Briefing/projectactive

ARIDA 3 SOLAR FARM is a 900 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C13. Proposed COD is 2030-07-01.

Queue ID
CAISO-1795
Location
Clark, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Mohave Substation 500kV

What stands out

1

ARIDA 3 SOLAR FARM is a 900 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C13; proposed COD is 2030-07-01.

Market and operating context

Queue date
2020-04-15
Proposed COD
2030-07-01
IA status
System Impact Study
Study phase
C13
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ARIDA 3 SOLAR FARM — verified asset snapshot

FieldValue
Queue IDCAISO-1795
LocationClark, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionMohave Substation 500kV
Queue date2020-04-15
Proposed COD2030-07-01
IA statusSystem Impact Study