Query
Ardesia Storage
Type
Entity Briefing
Entity
Ardesia Storage
Generated
2026-10-19T07:10:24.667Z

Briefing on Ardesia Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-25
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Ardesia Storage is a 100 MW Battery project in Texas, currently active.

Ardesia Storage Project LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-25.

Queue ID
ERCOT-23INR0503
Location
Caldwell, Texas
Technology
Battery
Developer
Ardesia Storage Project LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 7325 Mendoza - 7216 Lockhart

What stands out

1

Ardesia Storage is a 100 MW Battery project in Texas with status active.

2

Ardesia Storage Project LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-25.

Market and operating context

Queue date
2022-06-10
Proposed COD
2027-06-25
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ardesia Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0503
LocationCaldwell, Texas
TechnologyBattery
DeveloperArdesia Storage Project LLC
Market / regionERCOT
Point of interconnectionTap 138kV 7325 Mendoza - 7216 Lockhart
Queue date2022-06-10
Proposed COD2027-06-25