Query
Aratina Solar Center 2
Type
Entity Briefing
Entity
Aratina Solar Center 2
Generated
2026-10-17T18:56:14.974Z

Briefing on Aratina Solar Center 2

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
263 MW
Capacity
Under construction
Current status
2
Generators
Briefing/plantUnder construction

Aratina Solar Center 2 is a 263 MW Batteries asset in CAISO (California), currently Under construction.

Aratina Solar Center 2 is reported in California under 45MG 8me LLC. Available operating and financial measures include $1544/kW reported CapEx.

Location
Kern, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
45MG 8me LLC
Operator
45MG 8me LLC
Grid
CAISO (California)
Plant ID
64215

What stands out

1

Aratina Solar Center 2 is a 263 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Avantus tapped to supply solar, storage to Southern California Edison” (Renewables Now, 2025-11-20).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#40 of 992
National rank
#195 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Aratina Solar Center 2 — verified asset snapshot

FieldValue
LocationKern, California
TechnologyBatteries, Solar Photovoltaic
Owner / parent45MG 8me LLC
Operator45MG 8me LLC
GridCAISO (California)
Plant ID64215
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator