Aratina Solar Center 2 is a 263 MW Batteries asset in CAISO (California), currently Under construction.
Aratina Solar Center 2 is reported in California under 45MG 8me LLC. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Kern, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- 45MG 8me LLC
- Operator
- 45MG 8me LLC
- Grid
- CAISO (California)
- Plant ID
- 64215
What stands out
Aratina Solar Center 2 is a 263 MW Batteries asset in California with status Under construction.
Available financial measures include $1544/kW CapEx.
Latest linked story: “Avantus tapped to supply solar, storage to Southern California Edison” (Renewables Now, 2025-11-20).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #40 of 992
- National rank
- #195 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.