Briefing/projectactive
ARATINA SOLAR CENTER 1 is a 400 MW Solar+Battery project in California, currently active.
The reported queue phase is C08. Proposed COD is 2026-06-01.
- Queue ID
- CAISO-1204
- Location
- San Bernardino, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Kramer Substation 230kV
What stands out
1
ARATINA SOLAR CENTER 1 is a 400 MW Solar+Battery project in California with status active.
2
The reported queue phase is C08; proposed COD is 2026-06-01.
3
Latest linked story: “Avantus Closes Financing for Solar-Plus-Storage Project in Arizona” (Yahoo Finance, 2026-03-09).
Market and operating context
- Queue date
- 2015-04-30
- Proposed COD
- 2026-06-01
- IA status
- IA Executed
- Study phase
- C08
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.