Query
Aragorn Solar Project
Type
Entity Briefing
Entity
Aragorn Solar Project
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Aragorn Solar Project

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

187 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
21.8%
Capacity factor
358 GWh
Annual generation
Briefing/plantOperating

Aragorn Solar Project is a 187 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Aragorn Solar Project is reported in Texas since 2021 under SE Aragorn, LLC. Available operating and financial measures include 21.8% capacity factor and 358 GWh annual generation; $24.4/MWh reported energy value.

Location
Culberson, Texas
Technology
Solar Photovoltaic
Owner / parent
SE Aragorn, LLC
Operator
SE Aragorn, LLC
Grid
ERCOT (Texas)
Plant ID
63329

What stands out

1

Aragorn Solar Project is a 187 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 21.8% capacity factor and 358 GWh annual generation.

3

Available financial measures include $24.4/MWh energy value.

4

Latest linked story: “Project Finance Brief: Enel Green Power Acquires 3.2 GW Solar Portfolio in the US” (Mercom Capital Group, 2021-07-19).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#177 of 378
National rank
#452 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.