Query
Aragorn Solar Project
Type
Entity Briefing
Entity
Aragorn Solar Project
Generated
2026-10-10T15:12:06.131Z

Briefing on Aragorn Solar Project

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
187 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
21.8%
Capacity factor
358 GWh
Annual generation
Briefing/plantOperating

Aragorn Solar Project is a 187 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Aragorn Solar Project is reported in Texas since 2021 under SE Aragorn, LLC. Available operating and financial measures include 21.8% capacity factor and 358 GWh annual generation; $24.4/MWh reported energy value.

Location
Culberson, Texas
Technology
Solar Photovoltaic
Owner / parent
SE Aragorn, LLC
Operator
SE Aragorn, LLC
Grid
ERCOT (Texas)
Plant ID
63329

What stands out

1

Aragorn Solar Project is a 187 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 21.8% capacity factor and 358 GWh annual generation.

3

Available financial measures include $24.4/MWh energy value.

4

Latest linked story: “Project Finance Brief: Enel Green Power Acquires 3.2 GW Solar Portfolio in the US” (Mercom Capital Group, 2021-07-19).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#177 of 378
National rank
#452 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.