Query
Apple River
Type
Entity Briefing
Entity
Apple River
Generated
2026-10-19T13:27:00.610Z

Briefing on Apple River

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
1901
Operating since
3
Generators
61.5%
Capacity factor
13 GWh
Annual generation
Briefing/plantOperating

Apple River is a 2 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Operating.

Apple River is reported in Wisconsin since 1901 under Northern States Power Co - Minnesota. Available operating and financial measures include 61.5% capacity factor and 13 GWh annual generation; $2317/kW reported CapEx.

Location
St Croix, Wisconsin
Technology
Conventional Hydroelectric
Owner / parent
Northern States Power Co - Minnesota
Operator
Northern States Power Co - Minnesota
Grid
MISO (Midcontinent)
Plant ID
6231

What stands out

1

Apple River is a 2 MW Conventional Hydroelectric asset in Wisconsin with status Operating.

2

Latest annual operating measures report 61.5% capacity factor and 13 GWh annual generation.

3

Available financial measures include $13.9/MWh OpEx, $2317/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#40 of 61
National rank
#1150 of 1,462

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.