Briefing/owner18 operating assets · 2 queue projects
Apex Clean Energy includes 3.8 GW of operating capacity and 619 MW of proposed queue capacity in the current result.
18 operating plants span 12 states. The linked queue contains 2 projects totaling 619 MW. Wind is the largest operating technology group at 3.2 GW.
- Coverage
- 18 plants across 12 states
- Largest asset
- Singing Grass Wind · 603 MW
- Leading technology
- Wind · 3.2 GW
- Queue pipeline
- 2 projects · 619 MW
What stands out
1
18 operating plants total 3.8 GW across 12 states.
2
Wind is the largest operating technology group at 3.2 GW across 12 plants.
3
Singing Grass Wind is the largest returned operating asset at 603 MW.
4
2 queue projects total 619 MW of proposed capacity.
Market and operating context
- Largest state footprint
- Illinois · 800 MW
- Technology concentration
- Wind represents 3.2 GW
- Development pipeline
- 2 projects · 619 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.