Query
Antigo-Forrest Street Solar Project
Type
Entity Briefing
Entity
Antigo-Forrest Street Solar Project
Technology
solar
Generated
2026-09-20T05:20:31.898Z

Briefing on Antigo-Forrest Street Solar Project

Entity Briefing
Generated Sep 20, 2026·Dataset freshness not reported
6 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
0.5%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Antigo-Forrest Street Solar Project is a 6 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Antigo-Forrest Street Solar Project is reported in Wisconsin since 2024 under MGE Energy. Available operating and financial measures include 0.5% capacity factor and 0 GWh annual generation; $1532/kW reported CapEx.

Location
Langlade, Wisconsin
Technology
Solar Photovoltaic
Owner / parent
MGE Energy
Operator
Wisconsin Public Service Corp
Grid
MISO (Midcontinent)
Plant ID
67724

What stands out

1

Antigo-Forrest Street Solar Project is a 6 MW Solar Photovoltaic asset in Wisconsin with status Operating.

2

Latest annual operating measures report 0.5% capacity factor and 0 GWh annual generation.

3

Available financial measures include $22.9/MWh OpEx, $1532/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#45 of 132
National rank
#2534 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.