Query
Antelope Expansion 3B
Type
Entity Briefing
Entity
Antelope Expansion 3B
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Antelope Expansion 3B

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

5 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
24.9%
Capacity factor
11 GWh
Annual generation
Briefing/plantOperating

Antelope Expansion 3B is a 5 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Antelope Expansion 3B is reported in California since 2021 under AES Distributed Energy. Available operating and financial measures include 24.9% capacity factor and 11 GWh annual generation; $10.5/MWh reported energy value.

Location
Los Angeles, California
Technology
Solar Photovoltaic
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
CAISO (California)
Plant ID
62674

What stands out

1

Antelope Expansion 3B is a 5 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 24.9% capacity factor and 11 GWh annual generation.

3

Available financial measures include $10.5/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#356 of 992
National rank
#3591 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.