Annese Solar Project Hybrid CSG is a 8 MW Batteries asset in ISO New England, currently Operating.
Annese Solar Project Hybrid CSG is reported in Massachusetts since 2020 under AES Distributed Energy. Available operating and financial measures include 11.1% capacity factor and 8 GWh annual generation; $32.0/MWh reported energy value.
- Location
- Worcester, Massachusetts
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- AES Distributed Energy
- Operator
- AES Distributed Energy
- Grid
- ISO New England
- Plant ID
- 63474
What stands out
Annese Solar Project Hybrid CSG is a 8 MW Batteries asset in Massachusetts with status Operating.
Latest annual operating measures report 11.1% capacity factor and 8 GWh annual generation.
Available financial measures include $32.0/MWh energy value.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #27 of 525
- National rank
- #2375 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.