Briefing on Anglin BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
206 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Anglin BESS is a 206 MW Battery project in Texas, currently active.

Fort Worth BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-26INR0487
Location
Tarrant, Texas
Technology
Battery
Developer
Fort Worth BESS LLC
Market / region
ERCOT
Point of interconnection
1883 EVRSW 138kV

What stands out

1

Anglin BESS is a 206 MW Battery project in Texas with status active.

2

Fort Worth BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

Market and operating context

Queue date
2024-05-09
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Anglin BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0487
LocationTarrant, Texas
TechnologyBattery
DeveloperFort Worth BESS LLC
Market / regionERCOT
Point of interconnection1883 EVRSW 138kV
Queue date2024-05-09
Proposed COD2028-09-30