Angel City Solar is a 221 MW Solar project in Texas, currently active.
Angel City Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.
- Queue ID
- ERCOT-27INR0144
- Location
- Goliad, Texas
- Technology
- Solar
- Developer
- Angel City Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583
What stands out
Angel City Solar is a 221 MW Solar project in Texas with status active.
Angel City Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-09-30.
Latest linked story: “City of Taft gains renewable energy source with Peacock Solar Farm” (KRIS 6 News, 2025-01-25).
Market and operating context
- Queue date
- 2024-02-07
- Proposed COD
- 2029-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters