Query
Anderson 5
Type
Entity Briefing
Entity
Anderson 5
Generated
2026-10-08T11:39:36.314Z

Briefing on Anderson 5

Entity Briefing
Generated Oct 8, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
22.9%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Anderson 5 is a 3 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Anderson 5 is reported in Indiana since 2021 under Indiana Municipal Power Agency. Available operating and financial measures include 22.9% capacity factor and 6 GWh annual generation; $31.6/MWh reported energy value.

Location
Madison, Indiana
Technology
Solar Photovoltaic
Owner / parent
Indiana Municipal Power Agency
Operator
Indiana Municipal Power Agency
Grid
PJM Interconnection
Plant ID
64245

What stands out

1

Anderson 5 is a 3 MW Solar Photovoltaic asset in Indiana with status Operating.

2

Latest annual operating measures report 22.9% capacity factor and 6 GWh annual generation.

3

Available financial measures include $31.6/MWh energy value.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#93 of 144
National rank
#4698 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.