Briefing on Anawa La BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
104 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-08-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Anawa La BESS is a 104 MW Solar+Battery project in Texas, currently active.

Anawa La Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-31.

Queue ID
ERCOT-27INR0233
Location
Hidalgo, Texas
Technology
Solar+Battery
Developer
Anawa La Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 138KV 8394 Liston- 8392 Bates

What stands out

1

Anawa La BESS is a 104 MW Solar+Battery project in Texas with status active.

2

Anawa La Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-08-31.

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-08-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Anawa La BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0233
LocationHidalgo, Texas
TechnologySolar+Battery
DeveloperAnawa La Solar LLC
Market / regionERCOT
Point of interconnectionTap 138KV 8394 Liston- 8392 Bates
Queue date2024-03-22
Proposed COD2027-08-31