8 MW
Capacity
Standby
Current status
1949
Operating since
6
Generators
0.1%
Capacity factor
0 GWh
Annual generation
Briefing/plantStandby

Anadarko is a 8 MW Petroleum Liquids asset in PJM Interconnection, currently Standby.

Anadarko is reported in Ohio since 1949 under City of Woodsfield - (OH). Available operating and financial measures include 0.1% capacity factor and 0 GWh annual generation; $765/kW reported CapEx.

Location
Monroe, Ohio
Technology
Petroleum Liquids
Owner / parent
City of Woodsfield - (OH)
Operator
City of Woodsfield - (OH)
Grid
PJM Interconnection
Plant ID
2945

What stands out

1

Anadarko is a 8 MW Petroleum Liquids asset in Ohio with status Standby.

2

Latest annual operating measures report 0.1% capacity factor and 0 GWh annual generation.

3

Available financial measures include $765/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#16 of 36
National rank
#366 of 825

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.