Briefing/projectactive
Amphion Solar Phase 2 is a 206 MW Solar project in Texas, currently active.
Amphion Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-15.
- Queue ID
- ERCOT-28INR0343
- Location
- Atascosa, Texas
- Technology
- Solar
- Developer
- Amphion Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2
What stands out
1
Amphion Solar Phase 2 is a 206 MW Solar project in Texas with status active.
2
Amphion Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-05-15.
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2029-05-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.