AMERICAN KINGS SOLAR
Type
Entity Briefing
Entity
AMERICAN KINGS SOLAR
Generated
2026-10-13T00:03:39.961Z

Briefing on AMERICAN KINGS SOLAR

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
197 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2025-12-30
Proposed COD
TC
Queue phase
Briefing/projectactive

AMERICAN KINGS SOLAR is a 197 MW Solar+Battery project in California, currently active.

The reported queue phase is TC. Proposed COD is 2025-12-30.

Queue ID
CAISO-272
Location
Kings, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Henrietta 70 kV

What stands out

1

AMERICAN KINGS SOLAR is a 197 MW Solar+Battery project in California with status active.

2

The reported queue phase is TC; proposed COD is 2025-12-30.

3

Latest linked story: “Major clean power plant serving L.A. goes fully online in Kern County” (Los Angeles Times, 2025-08-06).

Market and operating context

Queue date
2007-11-01
Proposed COD
2025-12-30
IA status
IA Executed
Study phase
TC
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

AMERICAN KINGS SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-272
LocationKings, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionHenrietta 70 kV
Queue date2007-11-01
Proposed COD2025-12-30
IA statusIA Executed