Briefing/projectactive
AMERICAN KINGS SOLAR is a 197 MW Solar+Battery project in California, currently active.
The reported queue phase is TC. Proposed COD is 2025-12-30.
- Queue ID
- CAISO-272
- Location
- Kings, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Henrietta 70 kV
What stands out
1
AMERICAN KINGS SOLAR is a 197 MW Solar+Battery project in California with status active.
2
The reported queue phase is TC; proposed COD is 2025-12-30.
3
Latest linked story: “Major clean power plant serving L.A. goes fully online in Kern County” (Los Angeles Times, 2025-08-06).
Market and operating context
- Queue date
- 2007-11-01
- Proposed COD
- 2025-12-30
- IA status
- IA Executed
- Study phase
- TC
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.