Query
Amberjack2 BESS
Type
Entity Briefing
Entity
Amberjack2 BESS
State
TN
Technology
battery
Generated
2026-10-19T11:23:06.422Z

Briefing on Amberjack2 BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
180 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Amberjack2 BESS is a 180 MW Battery project in Texas, currently active.

Hunt Energy Network, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-03.

Queue ID
ERCOT-26INR0640
Location
Cameron, Texas
Technology
Battery
Developer
Hunt Energy Network, LLC
Market / region
ERCOT
Point of interconnection
79501 KINGFISHER 345KV

What stands out

1

Amberjack2 BESS is a 180 MW Battery project in Texas with status active.

2

Hunt Energy Network, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-03.

Market and operating context

Queue date
2025-01-28
Proposed COD
2028-04-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Amberjack2 BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0640
LocationCameron, Texas
TechnologyBattery
DeveloperHunt Energy Network, LLC
Market / regionERCOT
Point of interconnection79501 KINGFISHER 345KV
Queue date2025-01-28
Proposed COD2028-04-03