Query
Amazon SAN3 Solar Project
Type
Entity Briefing
Entity
Amazon SAN3 Solar Project
Technology
solar
Generated
2026-10-17T11:20:21.061Z

Briefing on Amazon SAN3 Solar Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
7 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
9.9%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Amazon SAN3 Solar Project is a 7 MW Batteries asset in CAISO (California), currently Operating.

Amazon SAN3 Solar Project is reported in California since 2024 under Solar Star Prime 4 LLC. Available operating and financial measures include 9.9% capacity factor and 6 GWh annual generation; $1361/kW reported CapEx.

Location
San Diego, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Solar Star Prime 4 LLC
Operator
Solar Star Prime 4 LLC
Grid
CAISO (California)
Plant ID
67170

What stands out

1

Amazon SAN3 Solar Project is a 7 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 9.9% capacity factor and 6 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#332 of 992
National rank
#2447 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.