Amazon MDW7 Solar Project is a 2 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
Amazon MDW7 Solar Project is reported in Illinois since 2022 under Solar Star Prime 6, LLC. Available operating and financial measures include 18.4% capacity factor and 3 GWh annual generation; $27.8/MWh reported energy value.
- Location
- Will, Illinois
- Technology
- Solar Photovoltaic
- Owner / parent
- Solar Star Prime 6, LLC
- Operator
- Solar Star Prime 6, LLC
- Grid
- MISO (Midcontinent)
- Plant ID
- 66022
What stands out
Amazon MDW7 Solar Project is a 2 MW Solar Photovoltaic asset in Illinois with status Operating.
Latest annual operating measures report 18.4% capacity factor and 3 GWh annual generation.
Available financial measures include $27.8/MWh energy value.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
- State rank
- #389 of 462
- National rank
- #6188 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.