Query
Altair Energy Storage
Type
Entity Briefing
Entity
Altair Energy Storage
Generated
2026-10-05T12:15:58.823Z

Briefing on Altair Energy Storage

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2030-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Altair Energy Storage is a 202 MW Battery project in Texas, currently active.

Altair Energy Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-03-31.

Queue ID
ERCOT-28INR0321
Location
Colorado, Texas
Technology
Battery
Developer
Altair Energy Storage
Market / region
ERCOT
Point of interconnection
Tap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)

What stands out

1

Altair Energy Storage is a 202 MW Battery project in Texas with status active.

2

Altair Energy Storage is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-03-31.

Market and operating context

Queue date
2025-04-21
Proposed COD
2030-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Altair Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0321
LocationColorado, Texas
TechnologyBattery
DeveloperAltair Energy Storage
Market / regionERCOT
Point of interconnectionTap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)
Queue date2025-04-21
Proposed COD2030-03-31