Query
Alta Wind X
Type
Entity Briefing
Entity
ALTA CASA STORAGE
State
AL
Generated
2026-10-11T08:18:30.305Z

Briefing on ALTA CASA STORAGE

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
515 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2031-10-21
Proposed COD
C14
Queue phase
Briefing/projectactive

ALTA CASA STORAGE is a 515 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2031-10-21.

Queue ID
CAISO-1922
Location
San Joaquin, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Tesla 500 kV

What stands out

1

ALTA CASA STORAGE is a 515 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2031-10-21.

3

Latest linked story: “BLM approves Alta Wind Battery Energy Storage project in California” (Bureau of Land Management (.gov), 2024-02-29).

Market and operating context

Queue date
2021-04-15
Proposed COD
2031-10-21
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ALTA CASA STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-1922
LocationSan Joaquin, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionTesla 500 kV
Queue date2021-04-15
Proposed COD2031-10-21
IA statusIA Executed