Query
Almond
Type
Entity Briefing
Entity
Almond
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Almond

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

20 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
22.4%
Capacity factor
39 GWh
Annual generation
Briefing/plantOperating

Almond is a 20 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Almond is reported in California since 2023 under Westlands Almond LLC. Available operating and financial measures include 22.4% capacity factor and 39 GWh annual generation; $4.4/MWh reported energy value.

Location
Kings, California
Technology
Solar Photovoltaic
Owner / parent
Westlands Almond LLC
Operator
Westlands Almond LLC
Grid
CAISO (California)
Plant ID
62546

What stands out

1

Almond is a 20 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 22.4% capacity factor and 39 GWh annual generation.

3

Available financial measures include $4.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#264 of 992
National rank
#1884 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.