Briefing/plantPlanned
Allegheny L&D2 Hydroelectric Project is a 9 MW Conventional Hydroelectric asset in PJM Interconnection, currently Planned.
Allegheny L&D2 Hydroelectric Project is reported in Pennsylvania under Rye Development. Available operating and financial measures include $1415/kW reported CapEx.
- Location
- Allegheny, Pennsylvania
- Technology
- Conventional Hydroelectric
- Owner / parent
- Rye Development
- Operator
- Rye Development
- Grid
- PJM Interconnection
- Plant ID
- 62401
What stands out
1
Allegheny L&D2 Hydroelectric Project is a 9 MW Conventional Hydroelectric asset in Pennsylvania with status Planned.
2
Available financial measures include $1415/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #22 of 31
- National rank
- #693 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.