Query
Alicea Solar Project Hybrid CSG
Type
Entity Briefing
Entity
Alicea Solar Project Hybrid CSG
Generated
2026-10-18T06:08:39.288Z

Briefing on Alicea Solar Project Hybrid CSG

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2020
Operating since
2
Generators
11.9%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Alicea Solar Project Hybrid CSG is a 4 MW Batteries asset in ISO New England, currently Operating.

Alicea Solar Project Hybrid CSG is reported in Massachusetts since 2020 under AES Distributed Energy. Available operating and financial measures include 11.9% capacity factor and 4 GWh annual generation; $31.7/MWh reported energy value.

Location
Worcester, Massachusetts
Technology
Batteries, Solar Photovoltaic
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
ISO New England
Plant ID
63469

What stands out

1

Alicea Solar Project Hybrid CSG is a 4 MW Batteries asset in Massachusetts with status Operating.

2

Latest annual operating measures report 11.9% capacity factor and 4 GWh annual generation.

3

Available financial measures include $31.7/MWh energy value.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#172 of 525
National rank
#4319 of 7,971

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.