Alabama Solar Park LLC is a 130 MW Solar project in New York, currently active.
Alabama Solar Park LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-01.
- Queue ID
- NYISO-995
- Location
- Genesee, New York
- Technology
- Solar
- Developer
- Alabama Solar Park LLC
- Market / region
- NYISO
- Point of interconnection
- Lockport - Batavia 115kV (Line#112)
What stands out
Alabama Solar Park LLC is a 130 MW Solar project in New York with status active.
Alabama Solar Park LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-10-01.
Latest linked story: “NY's largest planned solar farm in Genesee County wins honor” (Rochester Business Journal, 2025-03-19).
Market and operating context
- Queue date
- 2020-02-27
- Proposed COD
- 2028-10-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.