Query
AJO POWER BANK
Type
Entity Briefing
Entity
AJO POWER BANK
Generated
2026-10-06T14:08:04.398Z

Briefing on AJO POWER BANK

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
124 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2028-01-01
Proposed COD
C11
Queue phase
Briefing/projectactive

AJO POWER BANK is a 124 MW Battery project in California, currently active.

The reported queue phase is C11. Proposed COD is 2028-01-01.

Queue ID
CAISO-1442
Location
Santa Clara, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Llagas-Gilroy Foods 115 kV line

What stands out

1

AJO POWER BANK is a 124 MW Battery project in California with status active.

2

The reported queue phase is C11; proposed COD is 2028-01-01.

Market and operating context

Queue date
2018-04-16
Proposed COD
2028-01-01
IA status
IA Executed
Study phase
C11
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

AJO POWER BANK — verified asset snapshot

FieldValue
Queue IDCAISO-1442
LocationSanta Clara, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionLlagas-Gilroy Foods 115 kV line
Queue date2018-04-16
Proposed COD2028-01-01
IA statusIA Executed