Briefing/owner163 operating assets · 2 queue projects
AES Distributed Energy includes 719 MW of operating capacity and 817 MW of proposed queue capacity in the current result.
163 operating plants span 15 states. The linked queue contains 2 projects totaling 817 MW. Solar is the largest operating technology group at 624 MW.
- Coverage
- 163 plants across 15 states
- Largest asset
- AES Kekaha Solar, LLC Hybrid · 28 MW
- Leading technology
- Solar · 624 MW
- Queue pipeline
- 2 projects · 817 MW
What stands out
1
163 operating plants total 719 MW across 15 states.
2
Solar is the largest operating technology group at 624 MW across 155 plants.
3
AES Kekaha Solar, LLC Hybrid is the largest returned operating asset at 28 MW.
4
2 queue projects total 817 MW of proposed capacity.
Market and operating context
- Largest state footprint
- California · 204 MW
- Technology concentration
- Solar represents 624 MW
- Development pipeline
- 2 projects · 817 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.