AES Huntington Beach Energy Project is a 699 MW Natural Gas Fired Combined Cycle asset in CAISO (California), currently Operating.
AES Huntington Beach Energy Project is reported in California since 2020 under AES. Available operating and financial measures include 30.6% capacity factor and 1878 GWh annual generation.
- Location
- Orange, California
- Technology
- Natural Gas Fired Combined Cycle
- Owner / parent
- AES
- Operator
- AES Huntington Beach Energy, LLC
- Grid
- CAISO (California)
- Plant ID
- 62116
What stands out
AES Huntington Beach Energy Project is a 699 MW Natural Gas Fired Combined Cycle asset in California with status Operating.
Latest annual operating measures report 30.6% capacity factor and 1878 GWh annual generation.
Latest linked story: “California faces a crossroads on the path to 100% clean energy” (Los Angeles Times, 2019-12-12).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #15 of 303
- National rank
- #324 of 2,025
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.