Query
Adera Solar
Type
Entity Briefing
Entity
Adera Solar
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Adera Solar

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

20 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
9.8%
Capacity factor
17 GWh
Annual generation
Briefing/plantOperating

Adera Solar is a 20 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Adera Solar is reported in California since 2015 under AES Distributed Energy. Available operating and financial measures include 9.8% capacity factor and 17 GWh annual generation; $-55.3/MWh reported energy value.

Location
Madera, California
Technology
Solar Photovoltaic
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
CAISO (California)
Plant ID
60027

What stands out

1

Adera Solar is a 20 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 9.8% capacity factor and 17 GWh annual generation.

3

Available financial measures include $-55.3/MWh energy value.

4

Latest linked story: “sPower Purchases Solar Project from Solairedirect” (Solar Builder, 2015-05-19).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#224 of 992
National rank
#1782 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.