Acushnet Ball Plant 2 is a 2 MW Batteries asset in ISO New England, currently Out of service.
Acushnet Ball Plant 2 is reported in Massachusetts since 2019 under Acushnet. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2973/kW reported CapEx.
- Location
- Bristol, Massachusetts
- Technology
- Batteries
- Owner / parent
- Acushnet
- Operator
- Acushnet
- Grid
- ISO New England
- Plant ID
- 62835
What stands out
Acushnet Ball Plant 2 is a 2 MW Batteries asset in Massachusetts with status Out of service.
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
Available financial measures include $2973/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #56 of 58
- National rank
- #960 of 994
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.