Query
AC Ranch II
Type
Entity Briefing
Entity
AC Ranch II
Generated
2026-10-12T18:19:02.522Z

Briefing on AC Ranch II

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
230 MW
Capacity
Planned
Current status
1
Generators
Briefing/plantPlanned

AC Ranch II is a 230 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Planned.

AC Ranch II is reported in New Mexico under Lydian Energy. Available operating and financial measures include $1544/kW reported CapEx.

Location
Lea, New Mexico
Technology
Solar Photovoltaic
Owner / parent
Lydian Energy
Operator
Lydian Energy
Grid
SPP (Southwest Power Pool)
Plant ID
68579

What stands out

1

AC Ranch II is a 230 MW Solar Photovoltaic asset in New Mexico with status Planned.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Lydian Energy Secures $689M Financing for Solar and Battery Storage Projects” (Construction Owners Club, 2026-03-09).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
WECC
State rank
#6 of 122
National rank
#299 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

AC Ranch II — verified asset snapshot

FieldValue
LocationLea, New Mexico
TechnologySolar Photovoltaic
Owner / parentLydian Energy
OperatorLydian Energy
GridSPP (Southwest Power Pool)
Plant ID68579
ISO / marketSPP (Southwest Power Pool)
Balancing authoritySouthwest Power Pool