Query
AC Ranch II
Type
Entity Briefing
Entity
AC Ranch II
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on AC Ranch II

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

230 MW
Capacity
Planned
Current status
1
Generators
Briefing/plantPlanned

AC Ranch II is a 230 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Planned.

AC Ranch II is reported in New Mexico under Lydian Energy. Available operating and financial measures include $1544/kW reported CapEx.

Location
Lea, New Mexico
Technology
Solar Photovoltaic
Owner / parent
Lydian Energy
Operator
Lydian Energy
Grid
SPP (Southwest Power Pool)
Plant ID
68579

What stands out

1

AC Ranch II is a 230 MW Solar Photovoltaic asset in New Mexico with status Planned.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Lydian Energy Secures $689M Financing for Solar and Battery Storage Projects” (Construction Owners Club, 2026-03-09).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
WECC
State rank
#6 of 122
National rank
#299 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

AC Ranch II — verified asset snapshot

FieldValue
LocationLea, New Mexico
TechnologySolar Photovoltaic
Owner / parentLydian Energy
OperatorLydian Energy
GridSPP (Southwest Power Pool)
Plant ID68579
ISO / marketSPP (Southwest Power Pool)
Balancing authoritySouthwest Power Pool