Query
2W Permian Solar Project Hybrid
Type
Entity Briefing
Entity
2W Permian Solar Project Hybrid
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on 2W Permian Solar Project Hybrid

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

460 MW
Capacity
Operating
Current status
2021
Operating since
2
Generators
24.9%
Capacity factor
1005 GWh
Annual generation
Briefing/plantOperating

2W Permian Solar Project Hybrid is a 460 MW Batteries asset in ERCOT (Texas), currently Operating.

2W Permian Solar Project Hybrid is reported in Texas since 2021 under Ørsted. Available operating and financial measures include 24.9% capacity factor and 1005 GWh annual generation; $22.8/MWh reported energy value.

Location
Andrews, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Ørsted
Operator
2W Permian Solar, LLC
Grid
ERCOT (Texas)
Plant ID
63255

What stands out

1

2W Permian Solar Project Hybrid is a 460 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 24.9% capacity factor and 1005 GWh annual generation.

3

Available financial measures include $22.8/MWh energy value.

4

Latest linked story: “Ørsted's solar, battery portfolio sale indicates growing generating asset values” (S&P Global, 2025-02-05).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#29 of 378
National rank
#58 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.