2W Permian Solar Project Hybrid is a 460 MW Batteries asset in ERCOT (Texas), currently Operating.
2W Permian Solar Project Hybrid is reported in Texas since 2021 under Ørsted. Available operating and financial measures include 24.9% capacity factor and 1005 GWh annual generation; $22.8/MWh reported energy value.
- Location
- Andrews, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Ørsted
- Operator
- 2W Permian Solar, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 63255
What stands out
2W Permian Solar Project Hybrid is a 460 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report 24.9% capacity factor and 1005 GWh annual generation.
Available financial measures include $22.8/MWh energy value.
Latest linked story: “Ørsted's solar, battery portfolio sale indicates growing generating asset values” (S&P Global, 2025-02-05).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #29 of 378
- National rank
- #58 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.